Project Experience
Ponderosa Telephone Administration Building [ View Photos ]
This project was located in a remote mountain community in O’Neals CA. Site work consisted of various types of underground utilities, a 35,000 gallon fire water storage tank, a 4,000 gallon septic tank system and a 16,500 cubic foot ponding basin to assist with storm water runoff. The building is an 8,800 SF slab on grade wood framed structure with cementious siding and a rolled truss roofing systems. The interiors included metal studs, drywall, t-bar ceilings, electrified doors and security system.
United Health Centers [ View Photos ]
This project was located in a remote rural community in Parlier CA. Work consisted of a 1,500 SF addition to an existing medical facility and 10,000 SF of complete removal and remodel of the interior medical pods, labs, x-ray room, dental pods and administration space. The interiors consisted of metal studs, drywall, t-bar, lighting, security, fire alarm system, new mechanical systems both wet and dry, flooring and casework. The exterior received a complete upgrade to its cementious skin, windows, doors and a new main entry way structure. This building also received an emergency generator system.
Modified Records Fire Range [ View Photos ]
This project was located at Fort Hunter Liggett CA. Site work consisted of 40 acres of civil work, various types of underground utilities and power pole placement activities. The above ground structures included six masonry structures including a range operations control tower, operations building, storage building, ammo break down building, covered mess hall and bleacher enclosures. All masonry work was self performed on this project. Down range construction included 144 target placements and associated fox holes, electrical, low-voltage and various types of limit markers.
Bronchoscopy Suite Addition and Tenant Improvements [ View Photos ]
This project took place at the Naval Medical Hospital, San Diego CA. Site work consisted of the complete demolition removal and remodel of two interior suites to accommodate the new Bronchoscopy Suite. The project included the installation of a negative air filtration system, addition of VAV boxes and controls, a completely revised electrical plan, new fire sprinkler system, electrified doorways, case work, metal studs/drywall, painting and epoxy flooring system.
Fresno Supreme Office Buildings [ View Photos ]
This project took place in Fresno CA. Site work consisted of the construction of two masonry constructed multi story buildings totaling 18,000 SF. Working as the masonry subcontractor for this project we installed in excess of 12,000 units of cmu, 140 cubic yards of concrete and 7 tons of masonry rebar.
Villa Paseo Residential Development [ View Photos ]
This project took place in Tulare CA. The site work included nearly 5,000 lineal feet of CMU walls ranging from six to twelve feet in height. Working as the masonry subcontractor for this project we installed in excess of 50,000 units of cmu, 1,200 cubic yards of concrete and 25 tons of masonry rebar. |